WERKHAUS focuses on renewable energy

An in-house photovoltaic system with 816 solar modules (made in Germany) generates the power for the production in Bad Bodenteich. On peak days,  up to 80 per cent of the energy needs are covered by the system on a roof area of 3,500 m², average coverage is 20 per cent of the company’s energy needs.

The company has been purchasing the remaining power from Greenpeace Energy since 2009 and thus uses exclusively green electricity from renewable sources. By installing a central cooling system with heat recovery at the laser department in Bad Bodenteich, we only need the additional gas heating on very cold days, so that we can heat the entire factory site almost exclusively with wood residues.